How to Price a Landscaping Job in Australia: Building the Number From Cost, Not From a Per-Square-Metre Guide

Per-square-metre guides tell homeowners what a job might cost, not what it costs you. Here's how I build a price for 25 m² of limestone paving, turf and steel edging, line by line, and why it rarely matches the 'typical' range.

Business Tips

It's an inevitable client question, and often happens when I am standing there with my tape measure and a notepad. The client looks at the old lawn and asks what you reckon it'll cost, roughly. Then you get home, open the laptop at half seven and type "paving cost per square metre" into Google to check you're not mad. I've did it when I first started out, and I reckon most of us have. But if you want to know how to price landscaping work properly, those tables are the wrong place to start. They're written for homeowners. They tell a client what a job might cost. They don't tell you what your job costs you.

Why the per-square-metre tables don't help you

As landscapers, we're islands. You're never on site with another landscaper, so nobody tells you what they charge. The rate table fills that gap. The trouble is the tables don't agree with each other.

needatradie puts new turf at 10–25/m² and paving at 60–120/m². What's The Damage puts natural turf at 15–40/m² (typical $28) and paving at 60–160/m² (typical $100). Yakka Labour gives 90–150/m² for concrete pavers and 130–280/m² for natural stone. The first two are national averages. A range that wide isn't a price. It's a shrug.

How to price landscaping work from the ground up

So let's take a job with real quantities: 25 square metres of limestone paving, 15 square metres of turf and 20 lineal metres of steel edging. Here's how I build it, line by line.

Materials. Pavers with a waste allowance for cuts, motar and concrete slab, turf, any soil under the turf, and the edging with its stakes.

Excavation and bulking. Say you're digging the paving area out 150 mm. That's 25 × 0.15 = 3.75 cubic metres in the ground. Once it's out, it bulks up. It takes more room in the truck or the skip than it did in the ground, and how much depends on your soil. That's the number that decides how many loads you're paying for. Then there's the turf area: scraping off old lawn and weeds before you lay anything.

Machine. According to hireseeking, wet hire for a 1–2 tonne mini excavator is typically 80–100 + GST an hour, with a minimum of usually 3–4 hours and a float or travel charge of up to an hour's hire. The page isn't dated, so treat that as indicative and ring your own hire guy. The point is the minimum. If the dig takes the machine 90 minutes, you still pay for the minimum and the float.

Access. needatradie puts it plainly: if a small excavator can't get down the side of the house, everything moves by wheelbarrow, and that's slow and expensive. If it's hand dug and you barrow it in, the machine line shrinks and your labour hours blow out. Price the site you've got, not the site you wish you had.

Disposal. What's The Damage lists green waste removal at $120 low, $190 typical and $320 high for one trailer or ute load. That covers the old lawn. Spoil is a separate line, whether it's a skip bin or a tip run. needatradie says a good quote separates labour, materials and disposal. I agree. If disposal isn't its own line, it's usually the one that gets forgotten.

Labour hours. Write the hours out per task: set out, dig, base and compact, screed and lay, cuts, edging, turf prep, turf, clean up. Then multiply by your own costed rate. needatradie quotes 50–100 an hour for a landscaper, but that's what the market charges, not what your business needs.

I'll be honest about that rate. After a one-hour call with a landscaping coach, Yasmin went through my overheads spreadsheet with no emotion attached and told me the hourly rate I had to charge. I said there was no way I could quote that with a straight face. She talked me into using it on the next quote. We won it, and at about $75,000 it was the biggest job I'd done at that point. It was me stopping me.

Margin and GST. Costs plus overheads, then your margin, then GST on top. The ATO says you must register once your GST turnover reaches $75,000. If you're turning over more than that, you're charging GST, so compare your GST-inclusive total with the guides, not your ex-GST number.

Comparing your number with the "typical" range

Yakka Labour gives limestone its own line: 50–110/m² for the pavers alone and 120–220/m² supplied and laid. It also notes limestone is common in Perth, so a national figure may not reflect what your local supplier charges.

Here's what most homeowners miss, and plenty of us too. The same guide adds 20–40/m² on top for excavation and spoil removal on a grassed area. Its worked example, a 30 m² concrete paver patio at Rouse Hill, is costed line by line and comes to about $145/m² including GST for the paving alone, excluding excavation and disposal. Even the guide's own maths keeps the dig and the tip outside the headline number.

Then there's job size. Yakka Labour says small jobs sit at the upper end because the paver still needs to bring a plate compactor, saw and materials. Think of the fixed lines on our job: machine minimum, float, compactor, a load to the tip. Spread across 25 square metres, they weigh four times as much per square metre as they would across 100.

So if your built-up number lands above the range, that's probably not you being greedy. It's a small job, a real dig, real disposal and real access. Don't shave labour hours to get back into a table written for someone else. If the client wants it cheaper, I tell them the business doesn't discount, but I'm happy to help change the scope.

Where the margin actually leaks

It's rarely the pavers. It's the bulking you didn't allow for, the extra skip, the side gate that's too narrow, the machine minimum on a two-hour dig. I can't count the times I've sent a quote, had it accepted, and then on the job realised I hadn't factored something in.

That's a big part of why we built Ask Willow. It prompts for soil expansion, skip bins, access and slope while you're still on site, and it'll ask things like whether to allow for a concrete pump when access is tight, or for sealing new paving. It's not perfect. I always review numbers and make any changes needed like adding labour hours to give myself some grace. But it's a lot easier than starting from a blank page and I can do it from my mobile which saves me opening the laptop when I get home.

The takeaway

On your next quote, don't open a rate table. Write out every line: materials, base, dig and bulking, machine with its minimum, access, disposal, hours at your own rate, margin, then GST. Check it against the guides afterwards, as a sense check, not a ceiling. If it comes out higher, you'll know exactly why, and you can hold your price.