A lot of landscapers reckon that how to quote a landscaping job is really a laptop skill: get the gist of the job, then do the real work at night with the spreadsheet open. I believed that for years, and it isn't quite right. The quote gets built from what you capture while you're still at the job, and the laptop is just where you find out what you didn't write down. Skip bins, soil expansion, tight access: if they weren't noticed and noted on the day, no spreadsheet will pull them back out of thin air.
So if you're working out how to quote a landscaping job without rebuilding half of it from scratch at night, I reckon the fix is mostly in the time you spend on site, not the hours after dinner.
Why the night session takes so long
For a long time my day went like this. On the tools from early, phone going all day, a site visit on the way home, a quick dinner, then the kitchen table office. If you're pricing off scribbled notes, it's easy to hit a line item and realise you don't know the answer. How wide was the side gate? Was the fall towards the house or away from it? Was that clay?
So you guess, or ring the client, and the quote sits. I ended up with clients texting to say I'd looked at their job two weeks ago and they were just following up. And I hadn't started it. It wasn't laziness. I had no process and no time!
How to quote a landscaping job: capture it once, on site
The rule I work to now is simple. If a number or a question is going to come up when I'm pricing, I want it answered before I get back in the ute. Here's what that covers.
Measurements, written the way you'll price them
Don't write "paving out the back". Write it the way it'll appear as a line item: 25 square metres of limestone paving, 15 square metres of kikuyu turf, 20 lineal metres of steel edging, a block rendered retaining wall along the back fence with its length and height. Note the excavation depth under each area too, because that's where your soil volume comes from.
Take photos with the tape in shot. When you're second-guessing a measurement later, that photo saves you a phone call.
With edging, write down which system the job needs. I price a proprietary system like FormBoss or Shapescaper differently to plain flat bar, because flat bar has to be welded at the joins and it's harder and slower to install. If you don't know which one it is on the night, you'll guess, and you'll probably guess cheap.
Access: the cost that isn't on the drawing
Measure the narrowest point between the street and the work, not just the gate. Can a machine get in, or is it hand dug and barrow it in? How far is it from where the truck can park to where you're working? Are there steps, a narrow path, a pool fence in the way?
Then ask the follow-on questions. Where does the skip bin go? Can a concrete truck get close, or do you need a pump? Where do deliveries get dropped?
Tight access is one of the biggest margin leaks I see. It doesn't change the materials list much, but it massively changes the labour, and labour is where an underquote really hurts.
Slope, levels and what comes out of the ground
Note which way the site falls and roughly how much. A sloping block means cut and fill, retaining, drainage and more time. Then look at what you're digging. Grab a handful of soil if you can.
This matters because soil doesn't come out of the ground at the same volume it went in. Booms Up Civil's soil excavation guide says bulking can add anywhere from 15% to 40% to the material you have to deal with. Their rough figures: sand and gravel around 10 to 15%, topsoil and loam around 20 to 25%, clay 25 to 40% depending on moisture, and broken-up rock and shale 40 to 60% or more. Their own example is 50 cubic metres of clay in the ground turning into about 65 cubic metres loose in the back of a truck. That's more loads, more skip bins and more tip fees than the in-ground maths tells you. If you didn't note the soil type on site, you can't pick the right figure at night.
Services: don't assume
Before anyone digs, someone needs to know what's under there. Before You Dig Australia (BYDA) is a single point of contact for information about underground networks, so you don't have to chase each utility separately, and it lists landscaping among the work where you should lodge a free enquiry before you start.
On the site walk, BYDA's tips are worth following. Look for clues like the water, gas or electricity meters and the telco box. Remember pipes and cables can sit just outside the property, under the footpath, driveway or nature strip, and along fence lines. Never assume how deep they are, because BYDA says they can be just below the surface. Their plans are indicative only, and for assets on private property they suggest a skilled locator. If services look complicated, that's worth allowing for.
BYDA also says to work out who will lodge the enquiry before any contractor starts excavating, and notes that asset owners may seek compensation for damage. So agree that with the client up front.
Existing structures and what has to go
Walk the whole site and list everything that's coming out or getting worked around: old slabs, pavers, a tired retaining wall, a shed, stumps, a clothesline. Every one of those is demolition, labour and disposal. Note what stays, too, so you're not accidentally pricing to rip out a tree the client loves.
Questions to ask before you leave
These are the ones that save me a phone call later:
- Is there a plan, or are we working from a conversation?
- When do they want it done, and is the house occupied while we work?
- Do they want the new paving sealed?
- Irrigation: how many zones, pop-ups or drip line?
- Where can we park, and can we use their power and water?
- Who's lodging the BYDA enquiry?
- What has to stay exactly as it is?
Where software helps, and where it doesn't
This is a big part of why we built Ask Willow. You talk the job through and take photos on the site walk, and it prompts you for the things people forget: soil expansion, skip bins, access and slope difficulty. On one job the photo analysis picked up an old hot water system I hadn't even noticed and asked whether to allow for a plumber to remove it. That's the sort of thing that would've turned up halfway through the job otherwise.
I rarely open my laptop now, I can quote on my phone because Willow is doing all the work. It still needs checking over but it will get you 95% of the way there so you can be done before you get home rather than starting after dinner!
The takeaway
If you're building quotes at the laptop, the problem probably isn't the laptop. It's what you didn't capture on site. On your next site walk, don't leave until you've got measurements written as line items, the narrowest access point, the fall and soil type, the services clues, everything that's coming out, and answers to the client questions. Do that and the night session gets shorter, the quote gets out faster, and the numbers are a lot closer to the truth.